Roadshow: I-280 drivers wish for better striping, blind-curve warning, pretty

Roadshow: I-280 drivers wish for better striping, blind-curve warning, pretty
Between the lane striping and Botts' dots being long overdue for renewal, glare (especially during early morning and evening hours) from the concrete after the grinding of the surface a few years back, and the fact that the paved lanes no longer line …
Read more on San Jose Mercury News

Your Commute: Roadwork for today and Thursday
1 one-way traffic control for grinding operation. Delays up to 15 minutes. Rain Rock to Lucia, 8 a.m. to 3 p.m. … Canal Street, 9 a.m. to 1 p.m. through Friday: North- and southbound surface street No. 1 one-way traffic control for curb, gutter and …
Read more on The Salinas Californian

Plans in Motion For Moody Park
Parks and Recreation Director Mark Brislin said Tuesday the road will be reconditioned by grinding up and recycling the existing pavement and mixing it with the existing road bed then grading and packing it down to a hard surface. It will not be paved.
Read more on Valley News